|
Gyptech is now offering a comprehensive range of Vinyl laminated Gypsum Ceiling Panels.
| GS-154 |
GS-155 |
|
|
| GS-991 |
GS-975 |
|
|
|
Gyptech Vinyl laminated Gypsum Ceiling panels are consist of
- Vinyl Paper
- Paper Surface Gypsum plaster Board
- Plating Aluminum Membrane
|
Finishes
Gypetch Vinyl laminated Gypsum Ceiling Panels are available with different decorative vinyl lamination. The Gyptech Vinyl surface requires no further decorations, is easily cleaned and provides good light reflection. The Vinyl cleaned and provides good thermal insulation properties and for use in humid areas to function as a vapour barrier.
Gyptech Vinyl laminated Gypsum Ceiling Panels are square edge and are easily installed in exposed T-Grads Metal Systems to form suspended in all types of commercial, education and institutional buildings such as offices schools, hospitals, colleges, restaurant and shops.
| |
| » |
Size |
595 x 595 mm |
| » |
Standard Thickness |
8mm (before lamination) |
| » |
Thickness after Lamination |
9mm |
| » |
Lengthways Ruptures Load |
>360N |
| » |
Thickness tolerance |
+/-0.5 |
| » |
Size tolerance |
+/-1 |
|
| |
|
Gyptech Vinyl Laminated Gypsum Ceiling Panels are
- Moisture resistant
- Fire protection. The gypsum core will not support combustion or transmit temperatures in excess of 212°F until completely calcined –a slow process.
- The vinyl foil are classified as Class “2” in the flame Spread Test in accordance to British Standard 476 Part 7: 1971.
- Reduces great transmission thus making it very suitable for ceilings.
- Have good acoustic properties.
- Lighter, smoother and more uniform.
- The vinyl finish on the Gypsum Panels seals out moisture, bacteria, dirt and odors.
- A hard washable surface resists stain and abuse.
- Ideal for use in executive offices, lobbies, hotels, conference rooms, and restaurants.
- Thermal Resistance – R=0.41m2kw
- Thermal Conductivity – K- Value = 0.16 W/mk.
Storage and Handling
The area should be dry prior to ceiling installation work. All wet trades should be completed e.g. plastering. Flooring, etc.
Air conditioning duct work and Electrical Chasing or drawing lines should be completed.
The laying if ceiling tiles in the grid work should be done as the last work should be done as the last work before completion of interiors.
|